Pick your average monthly bill. Everything below updates — size, subsidy, savings, price and payback.
Turnkey prices for a standard RCC roof, including structure, installation, net-meter paperwork and subsidy filing. Your final quote comes after the site visit.
Price includes structure, installation, wiring and net-meter / DISCOM charges. Load enhancement or a 1-phase to 3-phase meter change is extra. Bigger or elevated structures, long cable runs or a tin roof may change the price — we tell you on the visit.
The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third. After 3 kW it stays at ₹78,000 — so the subsidy share of every extra kW drops fast.
If your bills need 5 kW, we'll install 5 kW. We just won't sell it to you when 3 kW does the job.
Through SBI/BAJAJ/ECOFY/SOLFIN. Many families pay an EMI close to what they used to pay as their bill.
Tip: the subsidy reaches your account after installation — use it to prepay the loan and cut interest.